ONEC completed a feasibility study for the City of Edmonton.  The project looked at rooftop and landfill solar at the Edmonton Waste Management Centre.  ONEC’s scope included site visits to verify interconnection equipment capabilities, perform shading analysis, and assess structures on site for suitability.

  • Client: City of Edmonton
  • Location: Edmonton Waste Management Centre, Edmonton, AB
  • Project Date: 2016
  • Scope: Solar Engineering, Structural Engineering
  • Status: Complete